Bow Thruster Reinstallation Without Drydock Successfully Done in Rotterdam

Hydrex divers successfully reinstalled the bow thruster of a 170-meter container ship in Rotterdam, avoiding costly drydock changes. Conducting the operation underwater allowed the vessel to stay on schedule. The team expertly maneuvered the fully assembled thruster into position, showcasing their expertise and ensuring timely completion for the ship’s owner.

Continue reading
Advertisements