Second Mate Orals: Chartwork and Passage Planning – 12 Questions
Passage planning and chartwork are central to the Second Mate (FG) oral exam. Surveyors often hand you a chart, ask you to plan a short passage, and then question you on the rules, the publications you used and how you would keep the ship on track. This set covers the questions candidates are asked most often, with short model answers and the rule or guidance behind each one.
How to use this set: read each question, answer it aloud as you would in front of the surveyor, then open the model answer to check yourself.
Questions and model answers
Q1. Where is passage planning made a legal requirement, and what must the voyage plan achieve?
SOLAS Chapter V, Regulation 34 requires the master to ensure, before proceeding to sea, that the intended voyage has been planned using the appropriate nautical charts and publications, taking into account the IMO guidelines. The plan must identify a route which takes into account relevant ships’ routeing systems, ensures sufficient sea room throughout the voyage, anticipates all known navigational hazards and adverse weather, and takes into account marine environmental protection measures, avoiding as far as possible actions that could damage the environment. The IMO guidance is Resolution A.893(21), Guidelines for Voyage Planning, and STCW also requires the voyage to be planned before each voyage.
Reference: SOLAS V/34; IMO Resolution A.893(21); STCW Code Section A-VIII/2, Part 2
Q2. What are the four stages of passage planning? Briefly explain each.
Appraisal: gathering all information relevant to the voyage, such as the ship’s condition and draught, charts and publications, weather and tides, routeing and reporting systems, traffic and pilotage. Planning: preparing a detailed plan covering the whole voyage from berth to berth, including the areas where a pilot will be on board, and marking it on the charts. Execution: carrying out the plan, taking into account the conditions at the time (final ETAs, tides, weather, traffic, equipment status). Monitoring: closely and continuously checking the ship’s position and progress against the plan.
Reference: IMO Resolution A.893(21), Guidelines for Voyage Planning
Q3. Which charts and publications would you use when planning an ocean and coastal passage?
Start with the chart catalogue (Admiralty NP131) to select the charts needed, including the largest-scale charts for coastal and port areas. Then use: Ocean Passages for the World (NP136) and routeing charts for the ocean leg; Sailing Directions (Pilots) for coastal and port information; the List of Lights and Fog Signals; the List of Radio Signals (for radio stations, VTS and reporting, pilot services and navigational warnings); Tide Tables and tidal stream atlases; the Mariner’s Handbook (NP100); IMO Ships’ Routeing for traffic separation schemes; and the latest Notices to Mariners and navigational warnings in force. Load line zone charts, company instructions and port information also form part of the appraisal.
Reference: SOLAS V/27; IMO Resolution A.893(21), section 2 (Appraisal)
Q4. How are charts and publications kept up to date, and what does the Admiralty Weekly Notices to Mariners contain?
SOLAS requires charts and publications for the intended voyage to be adequate and up to date. Admiralty products are updated by the Weekly Notices to Mariners. Its main sections are: I, explanatory notes and publications list; II, updates to charts; III, reprints of NAVAREA I navigational warnings; IV, updates to Sailing Directions; V, updates to the List of Lights; and VI, updates to the List of Radio Signals. The Cumulative List of Notices to Mariners (NP234) is published twice a year and shows the latest edition of each chart and the notices issued for it. Indian charts are updated through Indian Notices to Mariners from the National Hydrographic Office. Urgent information comes as navigational warnings by NAVTEX and SafetyNET; India is the coordinator for NAVAREA VIII.
Reference: SOLAS V/27; Admiralty Weekly Notices to Mariners, Section I explanatory notes
Q5. How do you correct a paper chart, and how are Temporary and Preliminary (T&P) notices treated?
First check the chart is the current edition. Apply each permanent correction neatly in waterproof ink at the position given in the notice, using the tracing or pasting the block correction where one is supplied. Only after the correction is complete, write the notice number and year in the bottom left-hand corner of the chart (the small corrections record), and enter it in the chart correction log. T&P notices are plotted in pencil and erased when they are cancelled or replaced. Keep a record of T&P notices in force for each chart so none are missed.
Reference: Admiralty NP294 (How to Keep Your Admiralty Products Up-to-Date); chart correction log (for example NP133A)
Q6. What will you check on a chart before using it for passage planning?
The chart number, title and edition date, and that it is the latest edition; the last correction applied and any T&P notices in force; the scale (use the largest scale available near danger); the units of depths and heights; the chart datum and the datum used for heights and clearances; the horizontal datum and any satellite-derived positions note; the source data or zone of confidence information showing the age and quality of the survey; and the cautionary and explanatory notes printed on the chart.
Reference: SOLAS V/27; Admiralty Chart 5011 (Symbols and Abbreviations)
Q7. Your GPS position is referred to WGS84. Can you plot it directly on any chart?
Not always. GNSS positions are referred to the WGS84 datum, but some charts are drawn on an older local horizontal datum. Such charts carry a “Satellite-Derived Positions” note giving a latitude and longitude shift to apply before plotting. Charts referred to WGS84 say that WGS84 positions can be plotted directly. If a chart has no note, or says the shift cannot be determined, do not assume GNSS positions agree with the chart; cross-check with visual and radar fixes. Keep the GPS receiver set to WGS84 and apply the chart note, rather than changing the receiver’s datum.
Reference: IMO SN/Circ.213, Guidance on chart datums and the accuracy of positions on charts
Q8. What is chart datum, and why is the datum for heights different?
Chart datum is the level from which charted depths, drying heights and predicted tidal heights are measured. On Admiralty and Indian charts it is usually close to Lowest Astronomical Tide (LAT), so the actual depth is normally the charted depth plus the height of tide. Heights of lights, land features and vertical clearances under bridges and power cables are measured from a high-water level (such as MHWS or HAT, as stated on the chart), so that the figure gives a safe, conservative clearance. Remember that weather, especially high pressure and offshore winds, can make the water level lower than predicted.
Reference: Admiralty Chart 5011; Admiralty Tide Tables (explanatory notes)
Q9. What are no-go areas and under keel clearance (UKC), and how do you decide the minimum UKC?
No-go areas are areas where the depth (charted depth plus expected height of tide) is less than the ship’s draught plus the required UKC; they are hatched or highlighted on the chart and the track must keep clear of them with a safety margin. UKC is the depth of water under the keel. The minimum UKC is set by the company SMS and any port or pilotage authority, and the planner must allow for squat (which increases sharply with speed and is greater in shallow, confined water), heel and roll, wave and swell motion, changes in water density, uncertainty in tidal predictions and the quality of the survey. Where UKC is tight, plan a reduced speed and the tidal window for that section.
Reference: IMO Resolution A.893(21), section 3 (Planning); company SMS UKC policy
Q10. What is a wheel-over point, and how do you mark it on the chart?
The wheel-over point is the position at which the helm order must be given so that, allowing for the ship’s advance and turning characteristics, she settles on the new course along the planned track instead of overshooting. It is worked out from the ship’s manoeuvring data (pilot card and manoeuvring booklet) for the planned speed and rudder angle. Mark it on the chart and make it easy to recognise on the bridge, for example with a bearing or radar range of a conspicuous object, or a parallel index line.
Reference: IMO Resolution A.893(21), section 3 (Planning)
Q11. What is an abort point, and what contingency plans should a passage plan include?
The abort point is the last position at which the ship can safely abandon a planned manoeuvre, such as entering a narrow channel or port approach, and turn away or hold off. Beyond it she is committed. It is marked on the chart with the reason it may be used (for example a berth not ready, tug or pilot not available, equipment failure, or poor visibility). Contingency plans include alternative routes, emergency anchorages, ports of refuge, and the actions to take for engine or steering failure in that area, so the OOW can act at once without having to plan under pressure.
Reference: IMO Resolution A.893(21), sections 3 and 4; company SMS
Q12. How do you monitor the ship’s progress against the plan in coastal waters?
Fix the position at regular intervals, short enough that the ship cannot run into danger between fixes, and use more than one method so that each check is independent: visual bearings, radar ranges and bearings, and GNSS. Use the navigational marks planned in advance: parallel index lines, clearing bearings and clearing ranges, leading lines, and transits. Compare the actual position and speed with the planned track and ETAs, check cross-track distance, and watch the echo sounder where depth is critical. Any departure from the plan, or doubt about the position, must be acted on at once and reported to the master as per the master’s standing orders.
Reference: IMO Resolution A.893(21), section 5 (Monitoring); STCW Code Section A-VIII/2, Part 4
Quick self-test
Choose your answer, then tap “Show answer” to check.
1. Which SOLAS Chapter V regulation requires the voyage to be planned before proceeding to sea? (a) Regulation 19 (b) Regulation 27 (c) Regulation 33 (d) Regulation 34
Answer: (d) Regulation 34, Safe navigation and avoidance of dangerous situations.
2. Temporary and Preliminary notices are applied to a paper chart: (a) in waterproof ink (b) in pencil (c) by a block correction only (d) they are not applied
Answer: (b) In pencil, so they can be erased when cancelled.
3. In the Admiralty Weekly Notices to Mariners, updates to the List of Lights are found in: (a) Section II (b) Section III (c) Section V (d) Section VI
Answer: (c) Section V; Section VI covers the List of Radio Signals.
4. Vertical clearances under bridges on a chart are normally measured from: (a) chart datum (b) a high-water level stated on the chart (c) mean sea level only (d) the ship’s keel
Answer: (b) A high-water level such as MHWS or HAT, as stated on the chart, giving a conservative clearance.
5. The last position from which a planned manoeuvre can be safely abandoned is the: (a) wheel-over point (b) waypoint (c) abort point (d) reporting point
Answer: (c) The abort point; beyond it the ship is committed.
Disclaimer: These questions and model answers are study aids written by CrewMirror, not official examination questions or answers. Please check the current text of SOLAS, STCW and the latest DGMA examination requirements before your exam. CrewMirror and its owners and operators will not be responsible for any loss or damage caused by the use of information published on CrewMirror pages and posts.
This article was prepared with the help of Internet Search and AI assistance tools.












