Second Mate Orals: Cargo Work Basics (Containers, Bulk, Tankers) – 12 Questions
Cargo work is where the Second Mate (FG) oral exam moves from the bridge to the deck. Surveyors want to see that you can keep a safe cargo watch, read a stowage plan, and know the basic rules for containers, dry bulk and tankers. This set covers the cargo questions candidates are commonly asked, with short model answers and the rule or code behind each one.
How to use this set: read each question, answer it aloud as you would in front of the surveyor, then open the model answer to check yourself.
Questions and model answers
Q1. What are your duties as officer of the watch during cargo operations in port?
Follow the agreed cargo and ballast plan and the Chief Officer’s standing orders. Make regular rounds of the deck: check moorings and gangway (tend them as the draught and tide change), draughts, trim, list and under keel clearance. Watch the cargo work itself: correct cargo going to the correct space, safe handling, damage to cargo or the ship, and stevedores working safely. Keep the security measures for the current ISPS level, keep fire and pollution precautions in place, and watch the weather.
Record important events in the log, keep in touch with the terminal, and call the Chief Officer or Master at once if anything goes wrong or you are in doubt: an unexpected list, a spill, damage, a fire, or parting moorings.
Reference: STCW Code, Section A-VIII/2, Part 5 (watchkeeping in port)
Q2. What are stowage factor and broken stowage? How much cargo of stowage factor 1.5 m³/t fits in a 6,000 m³ hold with 10% broken stowage?
Stowage factor is the volume one tonne of cargo occupies when stowed, usually in m³ per tonne (or cubic feet per long ton). Cargo with a high stowage factor is light for its volume and fills the hold before the ship is down to her marks; cargo with a low stowage factor is heavy and brings the ship to her marks before the hold is full.
Broken stowage is the space lost between packages, around frames, beams and pillars, and by dunnage. It is usually given as a percentage of the space.
Usable space = 6,000 × 0.90 = 5,400 m³. Cargo = 5,400 ÷ 1.5 = 3,600 tonnes.
Q3. What is the Verified Gross Mass (VGM) of a container, and how is it obtained?
The VGM is the total gross mass of a packed container: cargo, packing, dunnage, securing material and the container’s own tare mass. Since 1 July 2016, the shipper must verify it and give it to the Master (or his representative) and the terminal in the shipping documents, in good time before loading. A packed container without a VGM must not be loaded.
There are two methods. Method 1: weigh the whole packed and sealed container on calibrated, certified equipment. Method 2: weigh all the contents and add the container’s tare mass, using a procedure accepted by the authority of the country where the container was packed. Wrong container weights have caused stack collapses, lost containers and wrong stability calculations.
Reference: SOLAS VI/2; MSC.1/Circ.1475
Q4. Explain the bay-row-tier system. What does stowage position 140684 tell you?
Each slot on a container ship is given a six-digit number: bay, row, tier. Bays are counted from forward to aft; odd numbers (01, 03, 05) are 20-foot bays and even numbers (02, 04, 06) are 40-foot bays made up of two 20-foot bays. Rows are counted from the centreline outwards: odd numbers to starboard, even numbers to port, and 00 on the centreline where there is an odd number of rows. Tiers are even numbers counted upwards: 02, 04, 06 in the hold, and usually 80 or 82 upwards on deck.
140684 is a 40-foot container in bay 14, row 06 (the third row out on the port side), tier 84, which is on deck. The exact deck tier numbering can differ slightly between ships, so always check the ship’s own bay plan.
Q5. What is the Cargo Securing Manual, and what do you check on container lashings?
The Cargo Securing Manual is approved by the flag Administration and is required on ships carrying cargo other than solid and liquid bulk. Cargo units, including containers, must be stowed and secured throughout the voyage in accordance with it. For container ships it gives the permitted stack weights, the lashing patterns, the securing equipment carried and its maintenance and inspection.
After loading, check that twistlocks are locked, lashing rods are in the correct positions and turnbuckles are tight, bridge fittings are in place, and stack weights and heavy-over-light stowage are within the manual and the lashing computer. At sea, check lashings regularly and before bad weather, and re-tighten slack ones. Report damaged fittings and remove them from use.
Reference: SOLAS VI/5; MSC.1/Circ.1353 (guidelines for the Cargo Securing Manual)
Q6. Your ship will load dangerous goods in containers. What documents and checks are needed?
The IMDG Code is mandatory under SOLAS Chapter VII for dangerous goods in packaged form. The ship needs a Document of Compliance showing she meets the special fire safety requirements for the classes of dangerous goods she carries and the spaces where they may be stowed. The shipper must provide a dangerous goods declaration, and the ship must carry a dangerous goods manifest or a detailed stowage plan showing class, UN number and position of every dangerous goods unit.
Check that stowage and segregation follow the IMDG Code and the Document of Compliance, that containers carry the correct placards and marks, and that the emergency response (EmS) and medical first aid (MFAG) information is ready on the bridge. Report any leaking or damaged unit at once and do not load it.
Reference: SOLAS VII/3 and VII/4; SOLAS II-2/19.4; IMDG Code
Q7. What are Group A, B and C cargoes under the IMSBC Code? What is TML?
Group A cargoes may liquefy if shipped with a moisture content above their Transportable Moisture Limit (TML), for example many mineral concentrates. Group B cargoes have a chemical hazard. Group C cargoes are neither liable to liquefy nor chemically hazardous, but can still be dangerous (for example by shifting or reducing oxygen). Some cargoes are both A and B.
TML is the maximum moisture content considered safe for carriage. For a Group A cargo the shipper must give a certificate of TML and a certificate of moisture content, and the moisture must be below the TML. The interval between sampling or testing for moisture and the start of loading must never be more than seven days, and the cargo must be re-tested if it gets significantly wet before loading is completed. The can test is only a quick check on board; if the sample stays dry the moisture may still exceed the TML, so it never replaces the shipper’s certificates.
Reference: IMSBC Code, sections 1.7, 4.3, 4.5 and 8.4
Q8. How do you prepare a bulk carrier’s holds before loading?
Clean the holds to the standard the next cargo needs (sweeping, washing with sea water then fresh water for sensitive cargoes, and drying). Remove loose rust and scale and residues of the last cargo. Clean and test the bilge wells and bilge suction, and fit or renew the bilge covers (often with burlap) so cargo cannot enter the suction. Check sounding pipes, air pipes, ladders, lights and fire detection or smoke sampling lines.
Check hatch covers for weathertightness, by ultrasonic test or hose test as per company procedures, and inspect rubber packing, compression bars, cleats and drain valves. Many cargoes, such as grain, need a hold inspection by a surveyor before loading. Record all checks.
Q9. What does the BLU Code require before and during loading of a bulk carrier?
Before any solid bulk cargo is loaded or unloaded, the Master and the terminal representative must agree a loading or unloading plan, including the ballasting or deballasting, and sign it. The plan sets the hold order, quantity per pour and loading rate so that shear forces, bending moments and local strength stay within the ship’s limits at every stage. A ship/shore safety checklist is also completed jointly.
Loading must follow the agreed plan; any change needs prior agreement in writing. Ballast work must keep pace with cargo work. The Master can stop loading if the plan is not being followed or the ship is in danger. On completion, both sides confirm in writing that the work was done according to the plan.
Reference: SOLAS VI/7; BLU Code (resolution A.862(20), as amended)
Q10. Briefly explain how a draft survey is done.
A draft survey finds the weight of cargo by measuring the ship’s displacement before and after loading (or discharging). Read the six draught marks (forward, midships and aft, both sides), correct them to the perpendiculars, and find the mean of means (quarter mean) draught. Measure the dock water density with a hydrometer.
Take displacement from the hydrostatic tables and apply the trim corrections (first and second trim corrections), any list correction and the density correction. Then subtract the deductibles: ballast, fresh water, fuel and lube oil (all sounded and calculated) and the ship’s constant. The difference between the net displacements at the initial and final surveys is the cargo weight.
Q11. Why is an inert gas system fitted on tankers, and what oxygen levels must it achieve?
Hydrocarbon vapour can burn only if there is enough oxygen. Inert gas keeps the oxygen in the cargo tanks too low for combustion, so a spark from static, equipment or a lightning strike cannot cause an explosion.
The system must deliver inert gas with not more than 5% oxygen by volume, and keep the atmosphere in every part of the cargo tanks at not more than 8% oxygen and at a positive pressure, in port and at sea, except when a tank must be gas-free. If the oxygen in the supply exceeds 5%, the gas is automatically vented to atmosphere instead of going to the tanks. A fixed inert gas system is required on new oil and chemical tankers of 8,000 dwt and above constructed on or after 1 January 2016 (previously 20,000 dwt and above for oil tankers).
Reference: SOLAS II-2/4.5.5 and II-2/16.3.3; FSS Code, Chapter 15
Q12. What precautions do you take before and during loading on an oil tanker?
Before loading: hold the pre-transfer conference with the terminal and complete the ship/shore safety checklist; agree the loading plan, rates, communication and the emergency stop signal; line up and check the cargo lines and valves; plug the deck scuppers; have the pollution response (SOPEP) equipment ready; check that gauging systems and high-level and overfill alarms work; and confirm the tanks are inerted where required.
During loading: start at a slow rate and confirm cargo is going only into the intended tank. Keep the rate low until the inlet in the tank is well covered, to limit static electricity, then increase to the agreed rate. Monitor ullages, rates, inert gas pressure, moorings, stress and stability throughout. Reduce the rate in good time for topping off, keep a careful watch on the deck and over the side, and stop at once in case of a leak, overflow or any doubt.
Reference: ISGOTT (current edition); your company’s cargo operations procedures
Quick self-test
Choose your answer, then tap “Show answer” to check.
1. A container stowed in bay 13 is: (a) a 40-foot container (b) a 20-foot container (c) always on deck (d) always on the port side
Answer: (b) Odd bay numbers are 20-foot bays; even numbers are 40-foot bays.
2. The requirement for a Verified Gross Mass of packed containers is found in: (a) SOLAS II-2/19 (b) SOLAS VI/2 (c) MARPOL Annex III (d) the CSC Convention only
Answer: (b) SOLAS VI/2, in force since 1 July 2016.
3. An IMSBC Code Group A cargo is one that: (a) has a chemical hazard (b) may liquefy above its TML (c) is neither hazardous nor liable to liquefy (d) must be carried in containers
Answer: (b) Group A cargoes may liquefy if shipped with moisture content above the TML.
4. The inert gas system must keep the cargo tank atmosphere at an oxygen content not exceeding: (a) 5% (b) 8% (c) 11% (d) 21%
Answer: (b) 8% by volume in the tanks; 5% is the limit for the gas supplied to the main.
5. Under SOLAS VI/7 and the BLU Code, the loading plan for a bulk carrier is agreed and signed by: (a) the charterer and the shipper (b) the Master and the terminal representative (c) the Chief Officer and the surveyor (d) the port State and the flag State
Answer: (b) The Master and the terminal representative, before loading starts.
Disclaimer: These questions and model answers are study aids written by CrewMirror, not official examination questions or answers. Please check the current text of SOLAS, the IMDG, IMSBC and BLU Codes, ISGOTT, your ship’s approved manuals and the latest DGMA examination requirements before your exam. CrewMirror and its owners and operators will not be responsible for any loss or damage caused by the use of information published on CrewMirror pages and posts.
This article was prepared with the help of Internet Search and AI assistance tools.











