Auxiliary boilers and boiler water treatment come up in almost every Second Engineer (MEO Class II) oral exam. The surveyor wants to see that you know the safety devices, can read a water test and, most of all, know what to do when something goes wrong, such as a lost water level or a high chloride reading. This set covers the questions candidates are asked most often, with short model answers.
How to use this set: read each question, answer it aloud as you would in front of the surveyor, then open the model answer to check yourself.
Questions and model answers
Q1. What does SOLAS require for the safety of steam boilers?
- Every boiler and unfired steam generator must have at least two safety valves of adequate capacity (one may be accepted for a small boiler if overpressure protection is still adequate).
- Every oil-fired boiler that runs without continuous attendance must shut off the fuel and give an alarm at an attended place on low water level, combustion air supply failure or flame failure.
- A boiler meant to hold water at a set level must have at least two means of showing the water level, one of them a direct-reading gauge glass.
- There must be means to test and control the quality of the boiler water, and the feed system must be arranged so the boiler can be fed reliably.
Reference: SOLAS Chapter II-1, Regulation 32; classification society rules
Q2. What is an improved high-lift safety valve, and why is it used?
It is a spring-loaded safety valve in which the escaping steam is made to act on a larger area (for example a waste piston or a floating ring around the valve) once the valve starts to open. This gives a much greater lift than an ordinary spring valve, so a smaller valve can discharge all the steam the boiler can produce. It has easing gear so it can be lifted by hand from a safe place, and its setting is locked and sealed after the surveyor has witnessed it. The discharge is led to a safe place through the waste steam pipe, which must have a drain so condensate cannot collect on top of the valve.
Q3. How are boiler safety valves set and tested?
Safety valves are set with the boiler under steam, usually in the presence of the class surveyor. The pressure is raised slowly while the other valve is gagged (only finger-tight gags as per the maker), and the valve under test is adjusted to lift at the set pressure given in the boiler documents, then locked and sealed. The gag is then moved to the other valve and the process repeated, and all gags are removed and accounted for afterwards. An accumulation test may be required to show that, with the main steam stop closed and full firing, the valves can discharge all the steam without the pressure rising beyond the limit in the class rules. In service, the easing gear is tried as per the planned maintenance system, and the valve settings are verified at each boiler internal survey.
Reference: IACS UR Z18; classification society rules; boiler maker’s instructions
Q4. How do you blow through (test) a boiler gauge glass?
- Wear gloves and face protection and stand to one side of the glass.
- Close the steam and water cocks and open the drain cock.
- Open the steam cock: steam blowing out of the drain shows the steam side is clear. Close it.
- Open the water cock: water blowing out shows the water side is clear. Close it.
- Close the drain, then open the steam cock and the water cock slowly.
- The water level should rise quickly and settle at the same level as before and as shown by the other level indicator. A slow-rising or different level means a choked passage.
Q5. You find no water level visible in the gauge glass. What do you do?
Treat it as dangerously low water until proved otherwise. Shut off the burner at once and close the main steam stop to stop drawing steam. Do not pump feed water in, because cold water on overheated tubes or plates can cause sudden steam generation, cracking and even an explosion. Blow through the gauge glass and check the other level indicator: if the water level is actually high (the glass is full), reduce the level by blowing down. If it is low, let the boiler cool down, then inform the Chief Engineer, find the cause (feed pump, feed check valve, level control, tube leak) and have the boiler inspected for overheating damage before refilling and firing again.
Q6. Why is boiler water treated, and which tests are done on board?
Treatment prevents three main problems: scale (hardness salts forming an insulating layer that overheats tubes), corrosion (from dissolved oxygen and low pH) and carry-over of water and solids with the steam. Typical on-board tests are:
- Chloride: shows seawater contamination.
- Alkalinity (P and M or total) and pH: water is kept alkaline to reduce corrosion.
- Phosphate: phosphate turns hardness salts into a soft sludge that can be blown down.
- Oxygen scavenger reserve (for example hydrazine, DEHA or sulphite, depending on the chemicals used): confirms dissolved oxygen is being removed.
- Conductivity or total dissolved solids: shows when blowdown is needed.
The limits for each test depend on the boiler pressure and the chemical supplier, so always use the supplier’s and maker’s figures and log every result.
Q7. The chloride reading in the boiler water is high. What could be the cause and what will you do?
High chloride means seawater is getting into the feed system, for example through a leaking condenser or drain cooler tube, a fault in the fresh water generator (salty distillate) or contaminated feed water tanks. Repeat the test to confirm, then test the feed water, condensate and fresh water generator output to trace the source, and isolate it. Increase blowdown to bring the dissolved solids down and adjust chemical dosing as per the supplier’s advice. If the contamination is heavy, the boiler may have to be shut down, drained, flushed and refilled with good water. Inform the Chief Engineer and record the results.
Q8. What is the difference between scum blowdown and bottom blowdown?
Scum (surface) blowdown takes water from just below the normal water level to remove oil, foam and floating impurities and to reduce dissolved solids. Bottom blowdown takes water from the lowest point of the boiler to remove the sludge that settles there after chemical treatment. Bottom blowdown is normally done at low firing or with the boiler shut down so that the sludge has settled and the circulation is not upset. Always watch the water level while blowing down, open the ship-side valve first and close it last, and follow your company’s procedure on where blowdown may be discharged.
Q9. What are priming, foaming and carry-over?
Priming is the sudden carrying of slugs of water with the steam, usually caused by a very high water level or a sudden large steam demand that lowers the pressure. Foaming is a layer of bubbles on the water surface caused by high dissolved solids, oil or other impurities. Both cause carry-over, where water and dissolved salts leave with the steam. This can cause water hammer in steam lines, deposits in valves, heating coils and turbines, and wrong level readings. Prevent it by keeping the correct water level, avoiding sudden load changes, blowing down to control dissolved solids and keeping oil out of the feed system.
Q10. How can oil get into the boiler water, and why is it dangerous?
The usual route is a leaking fuel oil heating coil (for example in a settling or service tank, or a fuel heater) that returns oily condensate to the hot well or cascade tank. Oil forms a thin layer on heating surfaces that insulates them, so the tubes overheat and may bulge or fail, and it also causes foaming. The condensate observation tank and any oil detector on the return line must be checked every watch. If oil is found, find and isolate the leaking coil, divert the contaminated condensate, skim the cascade tank, use scum blowdown, and if the boiler is badly contaminated it must be shut down and cleaned (degreased) as per the chemical supplier’s advice.
Q11. What causes a furnace explosion or blow-back, and how is it prevented?
It happens when unburnt fuel or fuel vapour collects in the furnace and is then ignited, for example after a flame failure, a dripping or poorly atomising burner, or repeated attempts to light the burner without purging. Prevention: the furnace must be purged with air before every ignition (the burner management system does this automatically, for the time set by the maker); the flame detector (photocell or scanner) must be kept clean and tested so the fuel is shut off on flame failure; burners must be clean and atomising properly with fuel at the correct pressure and temperature; and after a failed ignition the cause must be found before trying again. Never by-pass the flame failure or purge sequence.
Q12. How often is a boiler surveyed internally, and how do you prepare it for entry?
Under the IACS requirements there must be at least two internal examinations of the boiler in each five-year special survey period, and the gap between two examinations must not exceed 36 months (a short extension may be allowed in exceptional cases). At each annual survey the boiler is examined externally and its safety devices are tested. To prepare for entry: shut down and cool the boiler, drain it, isolate and lock all steam, feed, blowdown and fuel valves (with notices posted), open the manholes from the top first, ventilate well, and treat it as an enclosed space with a permit, atmosphere tests and a standby person.
Reference: IACS UR Z18; your company’s enclosed space entry procedure
Quick self-test
Choose your answer, then tap “Show answer” to check.
1. SOLAS requires each steam boiler to have at least: (a) one safety valve (b) two safety valves (c) three safety valves (d) one safety valve and one bursting disc
Answer: (b) Two safety valves of adequate capacity (SOLAS II-1/32).
2. A high chloride reading in boiler water mainly shows: (a) oil contamination (b) too much phosphate (c) seawater contamination (d) low oxygen scavenger
Answer: (c) Seawater getting into the feed system, for example from a leaking condenser.
3. If the water level cannot be seen in the gauge glass, your first action is to: (a) start the feed pump at full rate (b) shut off the burner (c) open the safety valve easing gear (d) increase firing
Answer: (b) Shut off the fuel, and do not feed until the boiler has cooled and been checked.
4. Bottom blowdown is mainly used to remove: (a) floating oil (b) sludge settled at the bottom (c) dissolved oxygen (d) air from the steam space
Answer: (b) Sludge formed by the chemical treatment, which settles at the lowest point.
5. The interval between two boiler internal examinations must not exceed: (a) 12 months (b) 24 months (c) 36 months (d) 60 months
Answer: (c) 36 months, with at least two examinations in each five-year period (IACS UR Z18).
Disclaimer: These questions and model answers are study aids written by CrewMirror, not official examination questions or answers. Always follow your boiler maker’s and chemical supplier’s instructions and your company’s procedures, and check the current SOLAS, IACS and classification society requirements and the latest DGMA examination requirements before your exam. CrewMirror and its owners and operators will not be responsible for any loss or damage caused by the use of information published on CrewMirror pages and posts.